PLEASE LOOK AT ALL ATTACHED DOCUMENTS SO YOU USE THE DATA OFF OF IT.
All documents for the design phases from previous weeks will be resubmitted including, the project schedule, the project charter, the project budget, and the change control management plan. Changes should be made to the originals based on instructor feedback or if there were changes in the project.
In this week, you will additionally focus on preparing a report that details the end of the design phase. The report should be submitted to the CEO who will approve the beginning of the development phase.
Note: For this assignment, the instructor will act as your CEO.
The report should address the following:
- Need for the project.
- Strategies adopted.
- Brief description of the site and its design methodology.
- Attachments from previous weeks such as WBS, schedule, budget sheet, and change management plan (make changes as necessary based on grading feedback).
- Brief description of the methodology to be adopted for the development phase.
Prepare a 4- to 5-page report in a Microsoft Word document, in response to the above mentioned requirements.
Support your responses with examples