Civil Engineering

Civil Engineering

Work type:   Other : Homework

Format:         Other : Other (See instructions)

Pages:            1 pages ( 275 words, Double spaced

Academic level:       Undergrad. (yrs 3-4)

Subject or discipline:         Civil Engineering

Title:   HW 2

Number of sources:           0

Paper instructions:

Using sitework-related drawings for the SIRTI project, calculate the following quantities:

  • Square feet of asphalt paving for the East parking lot, including the driveway to the edge of the street. (1 point)-
  • Square feet of asphalt paving for the West parking lot, including the driveway to the edge of the street. (1 point)-
  • Linear feet of ½”, ¾”, and 2” pipe connected to Irrigation Control Valve 5, assuming a 2” pipe is used between the valve and the first junction and ¾” pipe is used from the first junction along the main trunk. (1.5 points)-
  • Cubic yards of “gravel base course” under the natural stone paving along the north edge of the site, where the bottom of the exterior stairs meets the bike/walking path along the river. (1.5 points)-

Submit any documentation (e.g., marked-up drawings) you used to determine the quantities.